Control joint calculator

Concrete cracks. Control joints decide where. The spacing rule is straightforward — in feet, use 2 to 3 times the slab thickness in inches — and joint depth should be a quarter of the slab thickness so the slab has a defined plane to crack along.

This calculator needs JavaScript. The reference table below covers the common cases.

Joint spacing and depth by slab thickness
ThicknessSpacingCut depth
4 in8–12 ft1 in
5 in10–15 ft1.25 in
6 in12–18 ft1.5 in
8 in16–24 ft2 in

The formula

spacing (ft) = 2–3 × thickness (in) · joint depth = thickness ÷ 4

Worked example

A 4 in slab: joints every 8 to 12 ft, cut 1 in deep. A 6 in slab: joints every 12 to 18 ft, cut 1.5 in deep.

Reference table

Joint spacing and depth by slab thickness
ThicknessSpacingCut depth
4 in8–12 ft1 in
5 in10–15 ft1.25 in
6 in12–18 ft1.5 in
8 in16–24 ft2 in

Assumptions

  • Keep panels as square as possible. Long, narrow panels crack across the middle.
  • Saw cutting is typically done within 6 to 18 hours of placement; earlier with a soft-cut saw.
  • Joint spacing tightens for mixes with higher shrinkage or where the subgrade restrains movement.